top of page
Western Region LAMP Pole
Site filling/ Back filling : 102.6 m3
Installation of: 40m Lamp Pole
Supply & installation of: 1X Pile (with 2.15m dia, Length 16m)
Supply & installation of: Decorative Fence (10x10m plot)
Supply & installation of: ETC ODU shed with foundation (1.8m x 3.6m)+ DU CAPEX ODU (2.4mx2.4m)
Lightning: 70mm2 tinned copper tape (with 1 lightning earth PIT)
Earthing: 35mm2 Y/G, with 3 earthing PIT)
bottom of page